Home » General »

MGZ’s recent project featured in the Boston Globe

Sunday, June 21st, 2009
Project featured in Boston Globe

MGZ, as builder, collaborated with architect Robert Stein to create this challenging project. The existing house was situated on a long, narrow lot which required greater coordination and logistical attention than the average renovation. The construction was unusually extensive, requiring the owners to temporarily relocate to another home during part of the process. When they were able to move back in, however, they believed that it was well worth the wait. The existing house was also extensively renovated, providing an open flow from new to existing spaces, with a light filled kitchen and breakfast area. Click here to see interior views of the new and renovated areas.
You can find the full article here.

©2024, MGZ Design and Construction. All rights reserved.
Site design by Cat 5 Labs